Investigación

Production Plant Redistribution and Scheduling

an Integrated Approach

Vol. 10 No. 17 (2014)
Published: 01-12-2014
Daniel Jaramillo
Universidad ICESI
Juliana Uriarte
Universidad ICESI
Luis Felipe Cardona
Universidad ICESI

The main concern of companies when carrying out a plant redistribution project is the interruption of manufacturing operations while departments are transferred. This article presents an optimization model for scheduling the transference of departments and production, in order to guarantee fulfillment of demand during a plant redistribution project execution. For this purpose, a mixed complete linear programming model (pem from its Spanish acronym) was applied that minimizes the cost of transferring departments, ensures demand fulfillment and limits the duration of the project to an established maximum. The results show that, when average plant machinery use is greater than 60%, the redistribution project and production scheduling are interdependent, thus the need for an integrated approach such as the one proposed in this article. This is derived from the research project “Optimization of Plant Redistribution Processes in Flexible Manufacturing” (“Optimización de procesos de redistribución de planta en manufactura flexible”) carried out at the Universidad Icesi in 2013-2014.

Keywords: plant distribution, plant redistribution, optimization, project scheduling

How to Cite

[1]
D. Jaramillo, J. Uriarte, and L. F. . Cardona, “Production Plant Redistribution and Scheduling: an Integrated Approach”, ing. Solidar, vol. 10, no. 17, pp. 71–81, Dec. 2014, doi: 10.16925/in.v9i17.807.

L. Nicol y R. Hollier, "Plant layout in practice", Material flow, vol. 1, pp. 101-107, 1985.

S. Kulturel-Konak, A. E. Smith y B. A. Norman, "Bi-objective facility expansion and relayout considering monuments", IIE Transactions, vol. 39, n.° 7, pp. 747-761, 2007.

T. Lacksonen y C.-Y. Hung, "Project scheduling algorithms for re-layout projects", IIE Transactions, vol. 30, n.° 1, pp. 91-99, 1998.

J. Driscoll y J. Sawyer, "A computer model for investigating the re-layout of batch production areas", International Journal of Production Research, vol. 23, n.º 4, pp. 783-794, 1985.

T. Lacksonen y M. Vijayvargiya, "Project scheduling for re-layout projects", Industrial Engineering Research Conference, pp. 566-570, 1994.

L. Rivera, L. Cardona, L. Vásquez y M. Rodríguez, "Selección de alternativas de redistribucion de planta: Un enfoque desde las organizaciones", Revista S&T, vol. 10, n.º 23, pp. 9-26, 2012.

M. Rosenblatt, "The dynamics of plant layout", Managment Science, vol. 32, n.º 1, pp. 76-86, 1986.

R. Batta, "The dynamics of plant layout", Management Science, vol. 33, n.º 8, pp. 10-65, 1987.

Urban, "Solution procidures for the dynamic facility layout problem", Ann. Opper, vol. 76, pp. 323-342, 1998.

T. Urban, "Computacional performance and efficiency of lower-bound procidures for the dinamic facility layout problem", Eur. J. Opper, vol. 57, n.º 2, pp. 271-279, 1992.

J. Balakrishnan, "The dynamics of plant layout", Management Science, vol. 39, nº 5, pp. 654-655, 1993.

W. Liu, "Tabu search heuristics for the dynamic facility layout problem", M.S. thesis, Morgaton, West Virginia University, 2005.

B. Montreuil y U. Venkaatadri, "Strategic interpolative design of dynamic manufacturing systems layout", Managment Science, vol. 37, n.º 6, pp. 682-694, 1991.

B. Montreuil y A. Laforge, "Dynamic layout design giving a scenario tree of probable futures", Eur J Oper Res, vol. 63, n.º 2, pp. 271-286, 1992.

T. A. Lacksonen y E. Emory Enscore Jr., "Quadratic assignment algorithms for the dynamic layout problems", Inter J Prod Res, vol. 31, n.° 3, pp. 503-517, 1993.

T. Lacksonen, "Static and dynamic layout problems with varying areas", J of the Operational Res Society, vol. 45, n.º 1, pp. 59-69, 1994.

J. Balakrishnan y C. Cheng, "Dynamic layout algorithms: a state of the art survey", Omega, vol. 26, n.º 4, pp. 507-521, 1998.

M. Mazinani, M. Abedzadeh y N. Mohebali, "Dynamic facility layout problem based on flexible bay structure and solving by genetic algorithm", Int J Adv Manuf Technol, vol. 65, n.° 5-8, pp. 929-943, 2013.

J. Tompkins y J. White, Facilities Planning, New York, NY: Jhon Wisley, 1984.

R. A. Millen, M. M. Solomon y P. Afentakist, "The impact of a single input/output device on layout considerations in flexible manufacturing systems", Inter Jourl of Prod Res, vol. 30, n.º 1, pp. 89-93, 1992.

K. Han, S. Bae y D. Jeong, "A Matrix-Based Approach to the Facility Re-Layout Problem", Inter J of Math Models and Methods in Applied Sciencies, vol. 7, n.º 5, pp. 584-591, 2013.

P. Hicks y T. Lowan, "CRAFT-M for layout arrangement", Indust Engineering, vol. 8, n.º 5, pp. 30-35, 1976.

E. Ferrari, A. Pareschi, A. Persona y A. Regattieri, "Plant Layout Computerised Design: Logistics and Relayout Program (LRP)", Inter J of Adv Manuf Technol, vol. 21, pp. 917-922, 2003.

M. Savsar, "Flexible facility layout by simulation", Computers & Industrial Engineering, vol. 20, n.º 1, pp. 155-165, 1991.

A. Baykasoglu, T. Dereli y I. Sabuncu, "An ant colony algorithm for solving budget constrained and unconstrained dynamic facility layout problems", Omega, vol. 34, n.º 4, p. 385–396, 2006.

S. Kulturel-Konak, "Approaches to uncertainties in facility layout problems: Perspectives at the beginning of the 21st Century", Journal of Intell Manuf, vol. 18, n.º 2, pp. 273-284, 2007.

G. Meng, S. S. Heragu y H. Zijm, "Reconfigurable layout problem", Int J of Prod Res, vol. 42, n.º 22, pp. 4709-4729, 2004.

MÉTRICAS
ARTICLE VIEWS: 1797
PDF VIEWS: 2083