[1]
Jaramillo, D. et al. 2014. Production Plant Redistribution and Scheduling: an Integrated Approach. Ingeniería Solidaria. 10, 17 (Dec. 2014), 71–81. DOI:https://doi.org/10.16925/in.v9i17.807.